Bathrooms · shower rooms · hot water

Bathrooms, tile by tile

We take out the old bathroom, redo the pipes, waterproof under the tiles and fit everything back. One team, one quote, one guarantee.

One person accountable

Plumber, tiler and fitter answer to the same name. You never chase four trades.

Under the tiles

What protects a bathroom cannot be seen

A shower leaks through the joints long before it leaks through the pipes. Under every tiled wet area we lay a waterproofing membrane, and we photograph it before it disappears under the tiles: the photos are yours.

1 year

Completion guarantee

Any defect reported in the first year after handover is put right.

2 years

Equipment guarantee

Taps, water heater, shower valve: what can be removed works, or is replaced.

10 years

Ten-year guarantee

Waterproofing and structure, insured for a decade after handover.

How a bathroom job runs

Four stages, one calendar

1

Visit and fixed quote

We measure, look at the pipes and the floor, then send a written quote with a start date and an end date.

2

Removal and pipework

The old bathroom goes, the supply and waste pipes are redone to standard while the walls are open.

3

Waterproofing and tiling

Membrane under every wet area, photographed, then the tiles. Joints are the last thing you see and the first thing that fails.

4

Fitting and handover

Basin, shower, taps, screen. We test everything with you and hand over the guarantee certificates.

Where we work

The streets we tile in

33000

Bordeaux

under 45 min

33130

Bègles

under 1 hour

33150

Cenon

under 1 h 15

33270

Floirac

under 1 hour

33310

Lormont

under 1 hour

33700

Mérignac

under 1 h 15

33600

Pessac

under 1 h 30

33140

Villenave-d'Ornon

same day

Every morning since

Their bathroom, a few years on

They showed us the waterproofing before tiling over it, photos included. Eight years on, not a single stain on the ceiling below.
Hélène M.Shower room, third-floor flat
We wanted to keep the old cement tiles on the floor. They worked around them without chipping a single one.
Julien and Sarah P.Bathroom in an old house
Two weeks announced, two weeks done, and the site swept every evening. We knew in advance which days the shower would be out of use.
Odile R.Bath replaced by a walk-in shower

Free, no obligation

Tell us about your bathroom

A few lines are enough: the size of the room, what bothers you, what you dream of. We call back to arrange a visit, the quote follows within the week.

Rather talk about it?01 23 45 67 89